SES, Obertyn, 8.435 MW

SES, Obertyn, 8.435 MW Location: Ivano-Fankovskaya oblast, Tlumatsky district, smt Obertyn, Ukraine Performed work: Design and production of fastening systems, pile driving, installation of structures and panels Number of modules: 31,244 FEM Fastening system: SMS-402 on aluminum profile FEM location: 4 rows, horizontal The number of driven piles: 9 073 pcs

SES, VERJATSA-2, 5.76 MW

SES, Veryatsa - 2, 5.76 MW Location: Transcarpathian region, Vinogradiv district, Ukraine Performed work: Design of fastening systems, pile driving, installation of structures and panels Number of modules: 21 004 FEM Fastening system: SMS-211 FEM arrangement: 2 rows, vertically The number of driven piles: 3 559 pcs   Completion Date: September 2018

Chernelitsa, 5.57 MWp

Chernelitsa, 5.57 MWp Location: Gorodenkovsky district, Ivano-Frankivsk region, Ukraine Performed works:  Design of fastening systems, piling, installation of structures and panels Modules: 20 240 FEM Mounting system: SMS-402 on the aluminum profile, ground static PVM arrangement: 4 rows, horizontally Completion Date: May 2018

Pavlovka ,5.9 MWp

Project Capacity: 5.9 MWp Performed works: Design and supply of mounting systems and panels, assembly works,pile ramming Location: village Pavlovka, Ivano-Frankivsk region,  Ukraine Mounting Systems: SMS-402 on the aluminum profile, ground static Modules: 21 696 FEM PVM arrangement: 4 rows, horizontal Completion Date:  April  2018