Chernelitsa, 5.57 MWp

Chernelitsa, 5.57 MWp Location: Gorodenkovsky district, Ivano-Frankivsk region, Ukraine Performed works:  Design of fastening systems, piling, installation of structures and panels Modules: 20 240 FEM Mounting system: SMS-402 on the aluminum profile, ground static PVM arrangement: 4 rows, horizontally Completion Date: May 2018

Pavlovka ,5.9 MWp

Project Capacity: 5.9 MWp Performed works: Design and supply of mounting systems and panels, assembly works,pile ramming Location: village Pavlovka, Ivano-Frankivsk region,  Ukraine Mounting Systems: SMS-402 on the aluminum profile, ground static Modules: 21 696 FEM PVM arrangement: 4 rows, horizontal Completion Date:  April  2018

Tavanskaya-2, 8.2 MWp

Project Capacity: 8.2  MWp Performed works:  Design and supply of mounting systems and panels, assembly works, concreting. Location:  Berislav, Kherson Region, Ukraine Mounting Systems: SMS-402 ground static Modules: 30 384 FEM PVM arrangement: 4 rows, vertical Completion Date: October 2017 Commissioning: March 2018

Lukvica , 4.5 MWp

Project Capacity: 4.5  MWp Performed works:  Design and supply of mounting systems and panels, assembly works, piling concrete, pile ramming Location:  Lukvica village, Bogorodochany district of the Ivano-Frankivsk region Mounting Systems: SMS-402 ground static Modules: 16 684 FEM PVM arrangement: 4 rows, vertical Completion Date: November 2017 Commissioning: December 2017